16dec2020 PIX: ILyushin IL-114-300 prototype flew at last...

ImageForum for news and discussions on civil aviation matters.

Moderator: gatso76

Forum rules
Image
Post Reply
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 21816
Joined: 25 Jan 2006, 08:02
Location: Netherlands

16dec2020 PIX: ILyushin IL-114-300 prototype flew at last...

Post by Stratofreighter »


https://www.youtube.com/watch?v=1vNuP_wHA2E

http://www.ilyushin.org/press/news/ev7315/
/
https://translate.google.com/translate? ... Fev7315%2F
December 30, 2019

specialists of the S.V. Ilyushin Aviation Complex (the headquarters of the UAC Transport Aviation Division)
completed the final painting of the first prototype IL-114-300.

The aircraft received a unique livery for participation in future test and certification flights.

“The color of the aircraft will help us determine the appearance and composition of the coatings to be used on the serial IL-114-300.

It is extremely important for us that the coating has special protective properties, high weather resistance, strength, elasticity,
”said the director of the Il-114 program, Maxim Kuzmenko.

In November 2019, a preliminary installation of the cockpit equipment and the aircraft control system was carried out,
which confirmed the correctness of the selected design decisions during the modernization of the aircraft.

“Currently, under the cooperation program at the serial plants of VASO PJSC, Aviastar-SP JSC and Sokol Aviation Plant,
units of two Il-114-300 aircraft are being manufactured,
which will be assembled
at the site of the head manufacturer of MiG RSK JSC in the branches of LAZ named after P.A. Voronin, Lukhovitsy.

It is planned to begin ground and then flight tests of the first prototype IL-114-300 next year.

At the end of 2020, it is planned to connect the Il-114-300 aircraft assembled at the LAZ them. P. A. Voronin.

In 2022, it is planned to complete the certification of IL-114-300,
and from 2023 to start mass deliveries, ”
said Yuri Grudinin, head of DTA, general director of PJSC Il.


The IL-114-300 regional turboprop aircraft is being modernized to meet the requirements of key regional civil aviation carriers.
IL-114-300 will come to replace the decommissioned An-24, as well as a number of foreign analogues.


The aircraft is being created in cooperation with leading Russian developers of systems and equipment,
the most significant amount of which is supplied by enterprises of the Rostec State Corporation.
Image
Last edited by Stratofreighter on 16 Dec 2020, 18:43, edited 4 times in total.
Airnieuws stopped, update FokkerNews.nl April-2024
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 21816
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Re: Rollout PIC: this Ilyushin IL-114 prototype will fly in

Post by Stratofreighter »

https://www.airway1.com/russian-turbopr ... september/
JULY 9, 2020

Russian turboprop aircraft Il-114-300 is expected to make its inaugural flight in September 2020

UAC is due to fly the first turboprop plane Il-114-300 in September 2020,
Russian Industry Minister Oleg Bocharov confirmed on Wednesday.

The passenger aircraft is an enhanced version of the original model,
created by Ilyushin in the 1980s and first flown in 1990.

With up to 68 seats, the twin-engine turboprop aircraft is expected to enter service in 2023
and have an annual production rate of 12 units.

“We will have the maiden flight of the aircraft at the turn of September,” Bocharov told TASS.
https://www.airway1.com/russian-turbopr ... september/
Airnieuws stopped, update FokkerNews.nl April-2024
User avatar
Stratofreighter
Scramble Master
Scramble Master
Posts: 21816
Joined: 25 Jan 2006, 08:02
Location: Netherlands

Re: Ilyushin IL-114-300 prototype to fly in December 2020...

Post by Stratofreighter »

https://www.ruaviation.com/news/2020/11/27/15622/
First flight of Il-114-300 plane will take place in coming days

Russian Aviaton » Friday November 27, 2020 12:57 MSK

The first flight of the Il-114-300 turboprop passenger aircraft will take place in coming days,
while first deliveries to customers are scheduled in 2023 as announced earlier,
Minister of Industry and Trade Denis Manturov told TASS in an interview on Friday.

"The first aircraft is actually on the airfield and is preparing for the maiden flight.
This will take place actually in days to come.
The second airplane is close to completion.
We meet the timeframe that was outlined.
We expect to have first supplies to Russian airlines from 2023," the Minister said.

The Il-114-300 is an airplane intended for local air routes.
The aircraft is scheduled to undergo certification in 2022
and its production will be up to 12 aircraft per year.
https://www.ruaviation.com/news/2020/11/27/15622/
Airnieuws stopped, update FokkerNews.nl April-2024
Post Reply

Return to “Civil Aviation News”